OWNER: Pampa Energía

LOCATION: Marcos Paz, Buenos Aires

WEIGHT: 810 ton.


We were hired by Techint to manufacture, transport and assemble two industrial plants for power generation: one for gas and the other for steam.

The project entailed closing the cycle of the existing gas turbine for that of the new steam cycle. Furthermore, we manufactured a series of platforms, pedestals, supports, columns and auxiliary structures for both plants.

Pampa Energía invested 350 million dollars in the entire project in order to reach an installed capacity of 1,226 MW compared to 825 MW at the time of the project, resulting in an improvement in the supply of installed power available for residential, commercial and industrial use.