Fabrication and assembly of the metallic structure for A3 and A4 panels (multipurpose mini stages) that form part of the Olympic Villa that is being built in the Roca Park building, for the 2018 Youth Olympic Games. The client is Criba Ingeniería SA and the final customer is the City of Buenos Aires.

These buildings and the Olympic Villa, after the Juegos, will be part of the urbanization of the area under the care.
260 ton of structure and 670 m² of Steel deck and 5700 m² between cubicle panels and laterales.

Estimated closing of assembly: November 2017